Nothing happened the week before the holiday break until today when the countertop was installed. The sink, faucet and water treatment system are also installed.

📷 Kitchen Remodel | FujiFilm X-T2 | Fujinon XF16-55mmF2.8 R LM WR at 16 mm
📷 Kitchen Remodel | FujiFilm X-T2 | Fujinon XF16-55mmF2.8 R LM WR at 16 mm
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 4.25mm f/1.8
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
📷 Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4

4 thoughts on “Kitchen Remodel Week 5

    • Hi Michael.

      We don't plan on being in New Jersey once the "kids" are out of college so we wanted a look that would make selling or renting (my preference) easier. The contractor is fantastic. His wife designs and he builds. They have both done work in many of the homes in the neighbourhood including close friends. We had the opportunity to visit a few kitchens they have done before we started the project. They also opened their home to us to see the work they did there.