Kitchen Remodel Week 5

Nothing happened the week before the holiday break until today when the countertop was installed. The sink, faucet and water treatment system are also installed. [caption id="attachment_62932" align="aligncenter" width="1024"] 📷 Kitchen Remodel | FujiFilm X-T2 | Fujinon XF16-55mmF2.8 R LM WR at 16 mm[/caption] [caption id="attachment_62933" align="aligncenter" width="1024"] 📷 Kitchen Remodel | FujiFilm X-T2 |…

Continue Reading

Kitchen Remodel Week 2

Monday The contractor is into the second week of our kitchen remodel project. Neither I nor the cat is happy with the noise, which makes work conference calls challenging, and the ever-present dust, but I am thrilled that the work is almost complete with only the countertop, kitchen sink, faucet, water treatment system, waste disposal,…

Continue Reading