Kitchen Remodel Week 2

By on December 21st, 2019 in General

Monday

The contractor is into the second week of our kitchen remodel project. Neither I nor the cat is happy with the noise, which makes work conference calls challenging, and the ever-present dust, but I am thrilled that the work is almost complete with only the countertop, kitchen sink, faucet, water treatment system, waste disposal, and backsplash left to complete.

Kitchen Remodel | Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4 | f/2.4 | ISO 160

Tuesday

New shelves and door were installed for the kitchen pantry.

17 Dec, 2019 | Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
Kitchen Remodel | 17 Dec, 2019 | Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4
17 Dec, 2019 | Apple iPhone 11 Pro | iPhone 11 Pro back camera 1.54mm f/2.4

Got some feedback? Please leave a comment below.